Southside Church of Christ

Lexington, Kentucky

Superior BES installed a Tremco ExoAir 120 Fluid-applied air and water barrier system to the new addition and also tied this system into the existing building.

The 2-story addition to Southside Church of Christ in Lexington, KY includes additional areas for gatherings as well as additions classrooms, bathrooms, kitchens, and play areas.